• Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds
  • Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds
  • Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds
  • Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds
  • Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds
  • Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds

Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds

After-sales Service: Online Technical Training or to The Site
Warranty: 1 Year
Product Type: Particle Board Making Machine
Automatic Grade: Semiautomatic
Power Source: Electric
Screw Design: Single-Screw
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Detailed Photos
Overview

Basic Info.

Model NO.
DT-01
Certification
CE, ISO
Condition
New
Customized
Customized
Usage
Producing Double T Slab
Factory
Dezhou Haitian
Size
Customized
Transport Package
Wooden Case
Specification
customized
Trademark
Hai Yu
Origin
China
Production Capacity
20 Sets /Year

Product Description

                                               construction machine precast concrete double T beam double T panel / slab moulds
Product Description

 

Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds
 1. Advantages: Large span, 8-9 meters or even more than 30 meters can be achieved.
Advantages: light weight, good fire resistance, strong durability, low cost and short construction period.
2. Process flow:
Mold cleaning, paint release agent, steel strand installation layout, (install end mold, install mold, steel strand tension), install mesh,
Cloth, maintenance, demoulding, release, finished products are transferred to the storage yard for maintenance.
3. Process points:
The mold has less seams so that the force is reasonable.
The arrangement of steel strands must not cross.
The ribs are poured first and then the panels are poured.
Vibrate to avoid the steel strand.
The curing steam temperature should not exceed 70°C.
Put the sheet from the two sections to the middle.
Lift two cranes at the same time.
The stacking is also in accordance with Duanmu's standard.
4. Labor cost:
A 120-meter line
4 people in one hour
Clean and oil for half an hour 4 people
Wiring puzzle 2 hours 4 people
Stretch for an hour for 2 people
Mesh embedded parts for two hours for 2 people
Fabric 2.5 hours for 5 people
No labor is needed for curing for 8-10 hours.
5. Board width, rib height, rib spacing and overall length are adjustable
6. Production line equipment:
Mould, tension, cloth (feeder plus track, or gantry cloth machine, or simple hopper), vibrating, maintenance (film or pipe addition), auxiliary equipment (ladder, sweeper, spreader, etc.)
Detailed Photos

Construction Machine Precast Concrete Double T Beam Double T Panel / Slab MouldsConstruction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds

Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now