Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year Free Warranty |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Carousel plant Precast concrete double walls/lattice girder floors production line
The carousel plant is used for the production of the panel components such as wall panels and floor slabs thickness less than 450 mm (including sandwich walls, double walls, solid walls, laminated slabs, lattice girder floors etc.), as well as more complex or pre-buried wall panels.
Utilizing a Precast Concrete system offers many potential advantages over site casting of concrete.
1)The production process for Precast Concrete is performed on ground level which helps with safety throughout a project. There is a greater control of the quality of materials and workmanship in a precast plant rather than on a construction site.
2)The forms used in a precast plant may be reused hundreds to thousands of times before they have to be replaced, which allows cost of formwork per unit to be lower than for site-cast production.
After sale service:
What kind of after sale service you can supply?
-We supply the technical supporting all the time.
-We supply one year warranty for whole machine.
-We supply free quick wear parts.
-We supply low charge continue maintenance when warrenty is expired.
-We supply free training to end-users.
-We Supply Turnkey solutions for whole precast plants
1.Why choose you?
-26 years professional experiences in the precast concrete machinery/molds and production line.
-Vice president of CCPA(Short for "Concrete and Cement Products Association of China")
-An ISO9001:2008 and CE certified company!
2.Where is your company situated?
Our factory located at Dezhou city, Shandong province, China.
3.How do we come to your factory?
If you are in Shanghai, take fast train from Hongqiao to Dezhou East, it takes 3-4h.
If you are in Beijing, take fast train from Beijing South to Dezhou East, it takes 1.5h.
We will pick you up at the destination station.
4.What is your payment term ?
You can transfer the payment via T/T. We will provide you the bank detail.
Generally, 30% prepaid and the rest 70% should be paid before shipping.
Key words:Carousel plant for reinforced concrete precast elements/Precast concrete plant circulation steel pallet for for lattice girder floors/sandwich walls