• Precast Concrete Wind Power Tower Model
  • Precast Concrete Wind Power Tower Model
  • Precast Concrete Wind Power Tower Model
  • Precast Concrete Wind Power Tower Model
  • Precast Concrete Wind Power Tower Model
  • Precast Concrete Wind Power Tower Model

Precast Concrete Wind Power Tower Model

After-sales Service: 12 Month
Warranty: 12 Month
Additional Services: Customized Logo
Transport Package: Ocean Transport
Specification: customer requirement
Trademark: HAIYU
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Origin
China
Production Capacity
20 Set/Sets Per Year

Product Description

Overview
 
Essential details
Condition:
New

Applicable Industries:
Construction works , Energy & Mining

Weight (KG):
2000

Showroom Location:
Kazakhstan, Uzbekistan, Russia

Video outgoing-inspection:
Provided

Machinery Test Report:
Provided

Marketing Type:
New Product 2020

Warranty of core components:
1 Year

Core Components:
motor, table, shuttle, tilting, vibtator, forming mould

Place of Origin:
Shandong, China

Brand Name:
Hai Tian

Warranty:
1 Year

Application:
precast concrete tower

Advantages:
for higher power wind turbines

Finished product:
precast concrete wind power tower

Certification:
CE ISO9001

Control system:
Electric Control
Supply Ability
Supply Ability
20 Set/Sets per Year
Packaging & delivery
Packaging Details
PLYWOOD CASE
Port
Tianjin/Qingdao
Picture Example:
 
 

Lead time:
Quantity(sets) 1 - 1 >1
Lead time (days) 60 To be negotiated

 

Precast Concrete Wind Power Tower Mold
 
As the scale of the single windmill is getting larger and larger, the tower has changed from wood to steel structure tower, then to welded tower, and then to conical steel tower. The diameter of the tower has also changed from more than 1m in the past to today's tower base. The maximum diameter of the tower is more than 5m, and the manufacturing, transportation and construction of the tower are becoming more and more difficult.
The precast concrete tower is a good solution to this problem, with stable structure, low production cost, fast construction, and convenient transportation.
 
Haitian's wind power tower mold consists of an inner mold and an outer mold, which can be customized according to different sizes of the tower. After the inner mold is locked, a steel cage is placed, and then the outer mold is installed and locked, and concrete is poured and cured. After the components are hardened, first open the outer mold, shrink the inner mold, lift out the tower frame components, and transport them to the site for installation after further maintenance.
 
Advantages:
1. Higher power wind turbines 2. Cost savings 3. More local employment 4. Easier transportation 5. Manufacturing close to wind farm site 6. Assembly of segments in the field 7. Very reliable and mature technology 8. Lower volatility in raw material price.
Precast Concrete Wind Power Tower ModelPrecast Concrete Wind Power Tower Model

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now