Customization: | Available |
---|---|
After-sales Service: | Offer |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PRECAST CONCRETE DOUBLE T BEAM MOLD/CONCRETE DOUBLE T BEAM CASTING MOLD MACHINE
1. Advantages: Large span, 8-9 meters or even more than 30 meters can be achieved.
Advantages: light weight, good fire resistance, strong durability, low cost and short construction period.
2. Process flow:
Mold cleaning, paint release agent, steel strand installation layout, (install end mold, install mold, steel strand tension), install mesh,
Cloth, maintenance, demoulding, release, finished products are transferred to the storage yard for maintenance.
3. Process points:
The mold has less seams so that the force is reasonable.
The arrangement of steel strands must not cross.
The ribs are poured first and then the panels are poured.
Vibrate to avoid the steel strand.
The curing steam temperature should not exceed 70°C.
Put the sheet from the two sections to the middle.
Lift two cranes at the same time.
The stacking is also in accordance with Duanmu's standard.
4. Labor cost:
A 120-meter line
4 people in one hour
Clean and oil for half an hour 4 people
Wiring puzzle 2 hours 4 people
Stretch for an hour for 2 people
Mesh embedded parts for two hours for 2 people
Fabric 2.5 hours for 5 people
No labor is needed for curing for 8-10 hours.
5. Board width, rib height, rib spacing and overall length are adjustable
6. Production line equipment:
Mould, tension, cloth (feeder plus track, or gantry cloth machine, or simple hopper), vibrating, maintenance (film or pipe addition), auxiliary equipment (ladder, sweeper, spreader, etc.)